You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Road in front of Cymbeline Court

Reported via desktop in the Blocked drain category by Ivo Haest at 17:36, Wednesday 8 July 2026

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 9755751.

The gullet has not been emptied in April 2026 as you state. Even if gullet is empty it would still not drain water because the pipe that drains this gullet into a roadside ditch is blocked and needs jetting.

Updates

  • This has been passed to the Highway Officer to investigate.

    We know that an important part of any road network is the drainage system which is designed to carry water away from the road surface. Even when a gully is clean and well maintained it will only cope with a certain volume of water at one time, a sudden and heavy downpour can still cause flooding especially if the road is in a low lying area.

    The Highway Officer is only able to inspect the drain when the water has cleared away, this will be done within 10 days and if required, an order will be raised to clear the drain.

    Posted by Buckinghamshire Council at 17:37, Wednesday 8 July 2026

This report is now closed to updates from the public. You can make a new report in the same location.