Crossing stream on footpath that leads from end of South Lane Stewkley
Reported via desktop in the Bridge is damaged category anonymously at 13:38, Monday 6 April 2026
Sent to Buckinghamshire Council 1 month, 1 week, 4 days, 2 hours, 58 minutes later. FixMyStreet ref: 9245857.
Large holes in foot bridge and rotten wood making this bridge unsafe to cross
Updates
-
Not all bridges and structures in Buckinghamshire are the responsibility Highways, other bodies that own bridges and structures include:
- Network Rail: structures associated with the ‘live’railway
- National Highways: Motorways
- Canal and River Trust
- Rights of Way
We undertake annual inspections of structures on the Highway that we are responsible for, including special inspections if needed (e.g., collision damage), we also carry out regular maintenance, along with strengthening works to keep our bridges and structures safe and operational, with a minimum of disruption.
The structures team will carry out an assessment of the bridge and if is our responsibility we will arrange for a site inspection and raise an order to carry out any works required.
If the bridge is not the responsibility of Buckinghamshire Highways we will forward this report to the relevant organisation.
Posted by Buckinghamshire Council at 13:39, Monday 6 April 2026
- Network Rail: structures associated with the ‘live’railway
-
Update
We have reviewed the issue reported and have amended the category; this will ensure your report is directed to the most appropriate team at the council.
State changed to: For Triage
Posted by Buckinghamshire Council at 13:48, Friday 15 May 2026
This report is now closed to updates from the public. You can make a new report in the same location.
