Kerb on pavement by St Mary's Church, Bicester Road, Oakley

Reported via mobile in the Kerb damage / issue category by John Mole at 18:50, Tuesday 10 March 2026

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 9083320.

Two granite setts have been removed by speedy lorry on B4011 going past Oakley Church. This path is used by old people, pedestrians and children, they have to walk inches away from speeding vehicles, including HGVs like the one that took the setts out. The last time a lorry hit the kerb stones here, albeit five stones was November 2021, they were finally replace by Bucks Highways September 2023 - totally unacceptable!

Updates

  • The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.

    There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.

    Posted by Buckinghamshire Council at 18:51, Tuesday 10 March 2026

  • Update

    The Highways Officer has attended the site and completed an inspection based on your report.

    As a result of this inspection, we plan to resolve the issue reported within 6-8 weeks.

    Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.

    Regards
    Buckinghamshire Highways

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 14:28, Thursday 12 March 2026

This report is now closed to updates from the public. You can make a new report in the same location.