Action scheduled
Crumbling Footpath
Reported via mobile in the Footpath / pavement problem category anonymously at 15:51, Wed 16 July 2025
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 7887936.
The stretch of footpath from the entrance to Newton Longville burial ground in the direction of Drayton Road past the village notice board is in a dangerous condition with the surface failed and loose gravel and mot exposed posing a serious tripping hazard to the elderly or infirm and generally poor footing to all.
Updates
-
The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.
Posted by Buckinghamshire Council at 15:52, Wed 16 July 2025
-
Update
Buckinghamshire Highways operates two methods for safety defect identification; proactively by Highway Inspectors who identify safety defects in line with Highways Safety Inspection Policy and reactively by Highway Officers following reports from the public.We are responsible for the maintenance of 2,200 miles of road and 1,500 miles of footpaths in Buckinghamshire, this means we have to prioritise works based on a set criteria which includes issues which may present an immediate danger, or significant inconvenience to users of the roads/footpaths, or to the structural condition of the highway and assets contained with the highway boundary.
Whilst priority defects will receive a repair within appropriate timescales as dictated by the above policy, more minor defects such as the defect you have reported may not be immediately scheduled for repair.
State changed to: No further action
Posted by Buckinghamshire Council at 09:51, Thu 17 July 2025
-
Update
The Highways Officer has attended the site and completed an inspection based on your report.
As a result of this inspection, we plan to resolve the issue reported within 6-8 weeks.
Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.
Regards
Buckinghamshire HighwaysState changed to: Action scheduled
Posted by Buckinghamshire Council at 11:18, Fri 18 July 2025
This report is now closed to updates from the public. You can make a new report in the same location.