Action scheduled
The Square, Long Crendon in the carpark
Reported via desktop in the Blocked drain category anonymously at 10:10, Monday 19 May 2025
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 7588198.
The rain drain has been cleaned and some of the galvanised steel grating replaced, however there are two areas that are loose and could cause a trip hazard. The whole length should have been replaced as it’s rusty and dangerous
Updates
-
This has been passed to the Highway Officer to investigate.
We know that an important part of any road network is the drainage system which is designed to carry water away from the road surface. Even when a gully is clean and well maintained it will only cope with a certain volume of water at one time, a sudden and heavy downpour can still cause flooding especially if the road is in a low lying area.
The Highway Officer is only able to inspect the drain when the water has cleared away, this will be done within 10 days and if required, an order will be raised to clear the drain.
Posted by Buckinghamshire Council at 10:11, Monday 19 May 2025
-
Update
The Highways Officer has attended the site and completed an inspection based on your report.
As a result of this inspection, we plan to resolve the issue reported within 6-8 weeks.
Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.
Regards
Buckinghamshire HighwaysState changed to: Action scheduled
Posted by Buckinghamshire Council at 09:13, Tuesday 20 May 2025
This report is now closed to updates from the public. You can make a new report in the same location.