You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Kerb below road level adding to flooding issues

Reported via mobile in the Kerb damage / issue category by Steve Cox at 08:34, Monday 19 May 2025

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 7587436.

As seen in the photos when the road was re-laid last year the road surface was left higher or level with road surface. Since then we have had 2x major flood issues on this road, as there is no real gulley along to the drains the flood water has come into the drives and then into the houses. Raising wouldn’t of prevented as the shear volume of water that fell was bad, but it would of helped initially for the water to be diverted into the drains not our properties!

Updates

  • The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.

    There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.

    Posted by Buckinghamshire Council at 08:34, Monday 19 May 2025

  • Update

    The Highways Officer has attended the site and completed an inspection based on your report.

    As a result of this inspection, we plan to resolve the issue reported within 6-8 weeks.

    Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.

    Regards
    Buckinghamshire Highways

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 14:10, Tuesday 27 May 2025

This report is now closed to updates from the public. You can make a new report in the same location.