Closed
Railway bridge roadway subsiding
Reported via desktop in the Bridges category anonymously at 18:40, Monday 12 May 2025
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 7559023.
The road surface on this bridge is potholed and subsiding.
Updates
-
Not all bridges and structures in Buckinghamshire are the responsibility Highways, other bodies that own bridges and structures include:
- Network Rail: structures associated with the ‘live’railway
- National Highways: Motorways
- Canal and River Trust
- Rights of Way
We undertake annual inspections of structures on the Highway that we are responsible for, including special inspections if needed (e.g., collision damage), we also carry out regular maintenance, along with strengthening works to keep our bridges and structures safe and operational, with a minimum of disruption.
The structures team will carry out an assessment of the bridge and if is our responsibility we will arrange for a site inspection and raise an order to carry out any works required.
If the bridge is not the responsibility of Buckinghamshire Highways we will forward this report to the relevant organisation.
Posted by Buckinghamshire Council at 18:40, Monday 12 May 2025
- Network Rail: structures associated with the ‘live’railway
-
Update
The Highway Officer has carried out an inspection and has identified that there is no immediate safety issues requiring attention, the decision is that no action will be taken at this stage.
The issue will be added to a package of works to be carried out at a later date.
Please note that all our roads are subject to regular Highways Safety Inspections, and all highway safety issues identified are actioned within the timescales set out in our policy.
State changed to: Closed
Posted by Buckinghamshire Council at 13:02, Friday 13 June 2025
This report is now closed to updates from the public. You can make a new report in the same location.