Closed
Sheridan Close, the stretch of road opposite number 1
Reported via desktop in the Road lines / road markings category anonymously at 17:13, Thursday 8 May 2025
Sent to Buckinghamshire Council 4 days, 18 hours, 58 minutes later. FixMyStreet ref: 7541311.
Someone has drawn parking bays onto this stretch of road, and one of them is labelled number '1'. They have been sprayed on with white spray paint and have been there about a month.
Updates
-
This has been passed to the Highway Officer to investigate, they will carry out an inspection within the next 10 working days.
All our roads are subject to safety inspections, and this includes identifying any markings that are badly damaged or degraded so we may already be aware of this issue and have raised a job to have them refreshed if this is the case we will update you that it is a duplicate job/enquiry.
If we were not aware of this issue, we will update you on what action will be taken, this may include adding the road markings to a package of works to be carried out at a later date.
Please note, the ambient temperature drops, and the air becomes much more humid during the winter months and materials won’t bond with the surface when it’s wet, defeating the purpose of applying them at all. Adding markings to a wet surface will essentially mean they become diluted. The moisture present on the road and also in the air will affect the finished quality of the markings, impacting their appearance and longevity, for this reason we only refresh road markings during winter months if there is a specific safety issue.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy in these cases no action will be taken.
Posted by Buckinghamshire Council at 17:13, Thursday 8 May 2025
-
Update
We have reviewed the issue reported and have amended the category; this will ensure your report is directed to the most appropriate team at the council.
State changed to: For Triage
Posted by Buckinghamshire Council at 15:17, Friday 9 May 2025
-
Update
We have inspected the issue reported and have reviewed the category selected.
The category has been changed to ensure it is passed to the correct team.
Posted by Buckinghamshire Council at 11:42, Monday 12 May 2025
-
This has been passed to the Highway Officer to investigate, they will carry out an inspection within the next 10 working days.
All our roads are subject to safety inspections, and this includes identifying any markings that are badly damaged or degraded so we may already be aware of this issue and have raised a job to have them refreshed if this is the case we will update you that it is a duplicate job/enquiry.
If we were not aware of this issue, we will update you on what action will be taken, this may include adding the road markings to a package of works to be carried out at a later date.
Please note, the ambient temperature drops, and the air becomes much more humid during the winter months and materials won’t bond with the surface when it’s wet, defeating the purpose of applying them at all. Adding markings to a wet surface will essentially mean they become diluted. The moisture present on the road and also in the air will affect the finished quality of the markings, impacting their appearance and longevity, for this reason we only refresh road markings during winter months if there is a specific safety issue.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy in these cases no action will be taken.
State changed to: Open
Posted by Buckinghamshire Council at 12:15, Tuesday 13 May 2025
-
Update
Buckinghamshire Highways operates two methods for safety defect identification; proactively by Highway Inspectors who identify safety defects in line with Highways Safety Inspection Policy and reactively by Highway Officers following reports from the public.We are responsible for the maintenance of 2,200 miles of road and 1,500 miles of footpaths in Buckinghamshire, this means we have to prioritise works based on a set criteria which includes issues which may present an immediate danger, or significant inconvenience to users of the roads/footpaths, or to the structural condition of the highway and assets contained with the highway boundary.
Whilst priority defects will receive a repair within appropriate timescales as dictated by the above policy, more minor defects such as the defect you have reported may not be immediately scheduled for repair.
State changed to: No further action
Posted by Buckinghamshire Council at 13:16, Tuesday 13 May 2025
This report is now closed to updates from the public. You can make a new report in the same location.