Action scheduled
Length of parking bays facing Bicester Road in The Square, Long Crendon
Reported via desktop in the Blocked drain category by Katie Lamb at 13:35, Wed 9 April 2025
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 7411310.
The channel drain with metal grating running the full length of the car parking bays facing the Bicester Road in The Square, Long Crendon is blocked. The metal grating in some areas is covered with tarmac left by contractors, in others it is blocked with mud, is broken or loose which is a trip hazard as well. When it rains the water runs from the top bays down into this area and causes flooding. The drain needs uncovering and cleaning and the grating replaced.
Updates
-
This has been passed to the Highway Officer to investigate.
We know that an important part of any road network is the drainage system which is designed to carry water away from the road surface. Even when a gully is clean and well maintained it will only cope with a certain volume of water at one time, a sudden and heavy downpour can still cause flooding especially if the road is in a low lying area.
The Highway Officer is only able to inspect the drain when the water has cleared away, this will be done within 10 days and if required, an order will be raised to clear the drain.
Posted by Buckinghamshire Council at 13:35, Wed 9 April 2025
-
Update
The Highways Officer has attended the site and completed an inspection based on your report.
As a result of this inspection, we plan to resolve the issue reported within 6-8 weeks.
Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.
Regards
Buckinghamshire HighwaysState changed to: Action scheduled
Posted by Buckinghamshire Council at 13:02, Wed 16 April 2025
This report is now closed to updates from the public. You can make a new report in the same location.