Action scheduled
On the road towards Slough opposite layby the drain is surrounded by pothole
Reported via desktop in the Pothole category anonymously at 18:14, Wednesday 5 March 2025
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 7231900.
This is the next drain towards slough past the previously reported problem on 28th Feb. Maybe when they fix the first one you can attend to this. This one is more dangerous as it is hidden when the rains arrive because of the very poor drainage the road floods. Not sure why you never solved this issue as well but emptying drains is not a thing these days I guess
Updates
-
The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy in these cases no action will be taken.
During winter months we receive a very high number of reports regarding potholes or a poor road surface, it's easy to assume that potholes are formed due to roads being poorly maintained but that is not usually the case. There are many factors that can cause potholes, particularly during the winter months when water seeps in through cracks in the road surface, collecting underneath and when the water freezes, it expands and creates cracks in the road surface. Our priority is always the safety of road users, so in some cases during busy periods a permanent repair is not always possible immediately. However, temporary repairs are a way to ensure the area is safe until such times as we can return to make a permanent repair.
Posted by Buckinghamshire Council at 18:14, Wednesday 5 March 2025
-
Update
The Highways Officer has attended the site and completed an inspection based on your report.
As a result of this inspection, we plan to resolve the issue reported within 6-8 weeks.
Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.
Regards
Buckinghamshire HighwaysState changed to: Action scheduled
Posted by Buckinghamshire Council at 11:16, Thursday 6 March 2025