You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Chartridge lane end of Lowndes avenue

Reported via mobile in the Footpath / pavement problem category anonymously at 19:21, Friday 10 January 2025

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6963677.

There are no dropdowns on the pavements at the top of Lowndes avenue. My husband is a wheelchair users and this makes it extremely difficult when we want to go into town from further up Chartridge lane. The pavement on the opposite side is too slippery and has quite a drop down to the road.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.

    There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.

    Posted by Buckinghamshire Council at 19:22, Friday 10 January 2025

  • Update

    Buckinghamshire Highways operates two methods for safety defect identification; proactively by Highway Inspectors who identify safety defects in line with Buckinghamshire Councils' Highways Safety Inspection Policy and reactively by Local Area Technicians following reports from the public. On receipt of reports, our Highway Inspection team make an assessment, determine if works are required and if so, the appropriate response times and repair method. It is in these instances only the larger defects are repaired; those which meet the safety intervention levels as outlined in the Inspection Policy. Any remaining defects are monitored for deterioration and added to other programmes of work for repair when resources are available. We also monitor and inspect the quality of repairs aiming to ensure that any work is carried out to the best and most appropriate standard.

    Whilst priority defects will receive a repair within appropriate timescales as dictated by the above policy, more minor defects such as the defect you have reported may not be immediately scheduled for repair. An order for a repair remains in our system for when resource allows and we will continue to monitor the location for any further deterioration.

    State changed to: No further action

    Posted by Buckinghamshire Council at 14:29, Wednesday

This report is now closed to updates from the public. You can make a new report in the same location.