Pavement dangerous and collapsing

Reported via mobile in the Kerb damage / issue category anonymously at 20:26, Wed 4 December 2024

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6820575.

On Valley View , the pavement has deteriorated and is now starting to collapse. There have been some large vehicles working on a garden project at 2 Valley View and the surface has following them driving on the pavement deteriorated to the point of being dangerous. Some of the cracks are six feet long. I previously pointed the problem with the pavement a year ago and was told that no action would be taken by the Council but this can now longer be ignored and the surface needs repairing as a matter of urgency.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.

    There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.

    Posted by Buckinghamshire Council at 20:30, Wed 4 December 2024

  • Update

    The Highway Officer has attended the site and carried an inspection based on your report.

    As a result of this inspection, we plan to resolve the issue reported within five working days.

    Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 12:17, Tue 17 December 2024

This report is now closed to updates from the public. You can make a new report in the same location.