You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

I reported this on Sept 12th ref 6464199

Reported via mobile in the Footpath / pavement problem category anonymously at 16:15, Wednesday 6 November 2024

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6702281.

Old Dashwood Hill Footpath going down the hill. The whole length of the path is unusable for a pushchair or disabled person and is even worse now with the slippery leaves. Seems to be taking a long time for even a temporary solution.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.

    There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.

    Posted by Buckinghamshire Council at 16:15, Wednesday 6 November 2024

  • An order has been raised to repair the issue reported, this will be a permanent repair to be carried out as soon as possible. However, there are occasions when a temporary repair is carried out for safety reasons until such time as we can mobilise resources to make the repair permanent.

    To ensure the highway network remains as safe as possible we will continue to carry out our regular Highways Safety Inspections which will include this issue until such times as the permanent repair is made

    Posted by Buckinghamshire Council at 08:17, Thursday 7 November 2024

This report is now closed to updates from the public. You can make a new report in the same location.