Slippery/Dangerous Surface along eastern footway on Windsor End, Beaconsfield

Reported via desktop in the Footpath / pavement problem category by Beaconsfield Town Council at 17:43, Thursday 10 October 2024

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6576910.

The surface i.e. stone slabs & cobbles along the eastern footway on Windsor End (from The Royal Saracens Head to 15 Windsor End, including the ramp in between) is extremely slippery and we receive reports of falls there throughout Autumn/Winter.

There are various issues to tackle - Removal of any moss/lichen, daily removal of fallen leaves, gritting in frost, and ultimately applying an anti-slip treatment to the surface along there soon on a calm day weather-wise.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.

    There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.

    Posted by Buckinghamshire Council at 17:43, Thursday 10 October 2024

  • Update

    The Highway Officer has attended the site and carried an inspection based on your report.

    As a result of this inspection, we have instructed our contractor to resolve the issue reported within five working days.

    Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.

    State changed to: Action scheduled

    Posted by Buckinghamshire Council at 13:17, Wednesday 23 October 2024