Action scheduled
Outside 21 Spearing Road, at junction with Grenfell Avenue
Reported via mobile in the Kerb damage / issue category anonymously at 10:10, Tue 8 October 2024
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6564861.
2 loose and damaged kerb stones, causing a trip hazard
Updates
-
The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.
Posted by Buckinghamshire Council at 10:10, Tue 8 October 2024
-
Update
The Highway Officer has attended the site and carried an inspection based on your report.
As a result of this inspection, we have instructed our contractor to resolve the issue reported within five working days.
Thank you for taking the time to let us know, your reports alongside our Highways Safety Inspections are crucial to ensuring our network is safe for all residents and visitors.
State changed to: Action scheduled
Posted by Buckinghamshire Council at 12:07, Wed 9 October 2024
This report is now closed to updates from the public. You can make a new report in the same location.