Action scheduled
Chilton Ford, Near Bridge Farm, Chilton Road/Chearsley Road, Chearsley, HP18 0DN
Reported via desktop in the Blocked drain category by Peter Evans at 13:13, Wed 2 October 2024
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6542672.
Network Rail have a culvert that extracts water from the railway which then passes under the road/railway bridge and enters the water course as seen on the map. There are two drains, one on either side of the bridge within the verge on the road, not NWR land. The pipework running between the two drains seems to be blocked and need jetting or suction to free the blockage.
Updates
-
This has been passed to the Highway Officer to investigate.
We know that an important part of any road network is the drainage system which is designed to carry water away from the road surface. Even when a gully is clean and well maintained it will only cope with a certain volume of water at one time, a sudden and heavy downpour can still cause flooding especially if the road is in a low lying area.
The Highway Officer is only able to inspect the drain when the water has cleared away, this will be done within 10 days and if required, an order will be raised to clear the drain.
Posted by Buckinghamshire Council at 13:13, Wed 2 October 2024
-
Update
The Highway Officer has attended the site and carried an inspection based on your report.
We assess repairs in accordance with our Highways Safety Inspection Policy. This allows us to prioritise the most serious repairs to be completed urgently, with more minor defects such as this one being planned to be completed within 6-8 weeks.
State changed to: Action scheduled
Posted by Buckinghamshire Council at 12:25, Thu 3 October 2024