Reported via desktop in the Footpath / pavement problem category anonymously at 20:00, Tuesday 13 August 2024
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6352671.
From 28 Stanhope road all the way to 11 wingate walk the pavement is very broken and has caused multiple falls to pedestrians. This is very dangerous I have reported this many times and it always gets shut down there is so much grass in the pavement and many potholes. Its diffilcit to walk on as a trip can easily happen and using a push chair is very difficult due to the grass. Can you please fix it ASAP
Updates
-
The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.
Posted by Buckinghamshire Council at 20:00, Tuesday 13 August 2024
-
Update
Buckinghamshire Highways operates two methods for safety defect identification; proactively by Highway Inspectors who identify safety defects in line with Highways Safety Inspection Policy and reactively by Highway Officers following reports from the public.We are responsible for the maintenance of 2,200 miles of road and 1,500 miles of footpaths in Buckinghamshire, this means we have to prioritise works based on a set criteria which includes issues which may present an immediate danger, or significant inconvenience to users of the roads/footpaths, or to the structural condition of the highway and assets contained with the highway boundary.
Whilst priority defects will receive a repair within appropriate timescales as dictated by the above policy, more minor defects such as the defect you have reported may not be immediately scheduled for repair.
State changed to: No further action
Posted by Buckinghamshire Council at 11:51, Friday 16 August 2024
This report is now closed to updates from the public. You can make a new report in the same location.