Build out on High St North

Reported via desktop in the Road sign with a light (other issue) category anonymously at 21:23, Thursday 27 June 2024

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6164727.

The absence of the illuminated bollard and taller road narrows sign is causing drivers to mistake whether the raod is clear or not. This evening a vehicle heading north just before the build out overtook another vehicle but failed to see the flattened remains of the old sign & bollard against the setting sun. So another dangerous near miss, only avoided by the driver in the overtaken vehicle braking heavily.

The failure to repair this traffic calming construction is now making this section of highway even more dangerous.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • The Street Lighting Team aim to repair all faulty lighting within 20 working days, however, there may be some circumstances that this time for repairs is be extended. For example, if it is an electricity supply fault, this will be passed to the local electricity network operator to attend and rectify as we cannot work on their network, in these cases we will update you to let you know it is an electricity supply fault.

    Posted by Buckinghamshire Council at 21:23, Thursday 27 June 2024

  • Update.

    We have attended the site and have carried out a full assessment on the lighting column. 95% of lighting reports are repaired on the first visit, as they are generally more minor issues such as replacing the bulb. Unfortunately, there are occasions when further work is required:

    Full column replacement, Lantern / bracket replacements and/or Specialist parts
    It is not economically viable for us to order and replace these items in isolation, we package works together and schedule them in by area. This means that in some cases the work will not be completed for up to 90 working days and we apologise for this, but it is essential to keep costs low and utilise the workforce in the most cost effective way.

    Vegetation clearance
    We will always try to remove vegetation which is blocking a street light or traffic signal on the first visit, but there are occasions when it is not safe for our operators to do so and specialist equipment such as a cherry picker and/or traffic management is required. This must all be scheduled in to ensure we are not disrupting other roads in the area; we aim to carry out this work within 90 working days.

    Further electrical investigation required
    If the initial inspection highlights there is an electricity supply fault, this will be passed to the local electricity network operator to attend and rectify, as we cannot work on their network, we are bound in these cases by the electricity supplier service levels, which tend to be again 90 working days.

    Please be assured we do have the job in hand, it just might take a little longer than normal, but we will update you when the work has been completed.

    Posted by Buckinghamshire Council at 10:32, Friday 28 June 2024

This report is now closed to updates from the public. You can make a new report in the same location.