You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Kerb stone protruding

Reported via desktop in the Kerb damage / issue category anonymously at 14:56, Wednesday 12 June 2024

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 6099385.

Following work by Gas contractors, the kerb stones have not been put back correctly and now protrude sufficiently to be a significant trip hazard.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.

    There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy.

    Posted by Buckinghamshire Council at 14:56, Wednesday 12 June 2024

This report is now closed to updates from the public. You can make a new report in the same location.