You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Upon entering Oakdene, on the right hand side of the road just before the chicane

Reported via desktop in the Blocked drain category anonymously at 11:41, Wednesday 20 March 2024

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5742144.

I first reported this issue in May 2023 and the photos attached were sent to you at that time. Your contractors attended earlier this year but, after strenuous efforts, they were not able to go deep enough to clear the problem. They told me that they needed heavier equipment and that they would report to the Council that further work was needed. Nothing has since happened. Can this please be attended to as the blockage is severe and prevents water from draining away properly.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This has been passed to the Highway Officer to investigate.

    We know that an important part of any road network is the drainage system which is designed to carry water away from the road surface. Even when a gully is clean and well maintained it will only cope with a certain volume of water at one time, a sudden and heavy downpour can still cause flooding especially if the road is in a low lying area.

    The Highway Officer is only able to inspect the drain when the water has cleared away, this will be done within 10 days and if required, an order will be raised to clear the drain.

    Posted by Buckinghamshire Council at 11:41, Wednesday 20 March 2024

  • An order has been raised to repair the issue reported, this will be a permanent repair to be carried out as soon as possible. However, there are occasions when a temporary repair is carried out for safety reasons until such time as we can mobilise resources to make the repair permanent.

    To ensure the highway network remains as safe as possible we will continue to carry out our regular Highways Safety Inspections which will include this issue until such times as the permanent repair is made

    Posted by Buckinghamshire Council at 08:46, Tuesday 26 March 2024

This report is now closed to updates from the public. You can make a new report in the same location.