Outside number 92 Bottrels lane

Reported via mobile in the Pothole category anonymously at 11:44, Monday 12 February 2024

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5565331.

Drain continuously blocked and road surface/pothole formed outside number 92 Bottrells lane. Situation is getting worse with hole doubling in size within a few weeks

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.

    There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy in these cases no action will be taken.

    During winter months we receive a very high number of reports regarding potholes or a poor road surface, it's easy to assume that potholes are formed due to roads being poorly maintained but that is not usually the case. There are many factors that can cause potholes, particularly during the winter months when water seeps in through cracks in the road surface, collecting underneath and when the water freezes, it expands and creates cracks in the road surface. Our priority is always the safety of road users, so in some cases during busy periods a permanent repair is not always possible immediately. However, temporary repairs are a way to ensure the area is safe until such times as we can return to make a permanent repair.

    Posted by Buckinghamshire Council at 11:45, Monday 12 February 2024

  • Update

    The Highway Officer has carried out an inspection and has identified that there is no immediate safety issue, even when a gully is clean and well maintained it will only cope with a certain volume of water at one time, a sudden and heavy downpour can still cause flooding especially if the road is in a low lying area, this generally clears away over a matter of hours.

    It is not financially viable for us to action all non-safety issues in isolation, these non-safety issues are added to a package of works for the area. In addition, all our roads are subject to Safety Inspections, and this includes identifying drainage issues, we also have a gully clearance programme where we inspect and clear all 85,000 Buckinghamshire owned gully’s annually.

    If your property is in danger of flooding please refer to the flooding information and guidance on the Buckinghamshire website

    State changed to: Closed

    Posted by Buckinghamshire Council at 10:19, Tuesday 20 February 2024