On Lower Road between Mill Lane and South Park junctions
Reported via mobile in the Pothole category anonymously at 08:26, Sunday 11 February 2024
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5560270.
Lower road is riddled with huge potholes as depicted here, many in long rows. I am going to report as many as I can today. Bear in mind it is very hard to plot them exactly on this site. The issues have been present for months, I’m sure they will have been reported previously but nothing has been done.
Updates
-
The report has been passed to the Highway Officer, who will carry out an inspection of the issue within 10 working days, emergency defects will be corrected or made safe at the time of the inspection, if reasonably practicable to do so. In this context, making safe may constitute displaying warning notices, coning‐off or fencing‐off to protect the public from the defect or other suitable action. If the inspection team cannot make safe the defect at the time of inspection, then they will instigate the relevant emergency call procedures to ensure appropriate resources are mobilised to make the defect safe.
There may also be occasions when the issue reported will not be repaired as it has been classified as a minor defect and does not pose any risk to either the safety or the integrity of the highway, these are called minimum recording levels as specified in our Highways Safety Inspection Policy in these cases no action will be taken.
During winter months we receive a very high number of reports regarding potholes or a poor road surface, it's easy to assume that potholes are formed due to roads being poorly maintained but that is not usually the case. There are many factors that can cause potholes, particularly during the winter months when water seeps in through cracks in the road surface, collecting underneath and when the water freezes, it expands and creates cracks in the road surface. Our priority is always the safety of road users, so in some cases during busy periods a permanent repair is not always possible immediately. However, temporary repairs are a way to ensure the area is safe until such times as we can return to make a permanent repair.
Posted by Buckinghamshire Council at 08:27, Sunday 11 February 2024
-
An order has been raised to repair the issue reported, this will be a permanent repair to be carried out as soon as possible. However, there are occasions when a temporary repair is carried out for safety reasons until such time as we can mobilise resources to make the repair permanent.
To ensure the highway network remains as safe as possible we will continue to carry out our regular Highways Safety Inspections which will include this issue until such times as the permanent repair is made
Posted by Buckinghamshire Council at 17:29, Monday 12 February 2024
This report is now closed to updates from the public. You can make a new report in the same location.