You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

City Fibre installed a junction box without permission

Reported via desktop in the Failed reinstatement category anonymously at 11:41, Mon 4 December 2023

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5279630.

City Fibre installed a junction box in the front garden of 316 Rutland ave. HP12 3LX, without permission. They have destroyed an apple tree that was planted by the resident and the had left the equipment there, which was collected this morning. The garden was left all muddy and destroyed. They will return to resurface the road. Please contact the caller on about this.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • After carrying out any work on the highway, this includes the footpaths/verge, companies who have a legal right or permission to work on the public highway must adhere to the standard set out in the Code of Practice for Reinstatements. These works are guaranteed for 2-3 years dependant on the depth of excavation, if a reinstatement fails and is within the guarantee period, we can instruct them to fix the fault.

    We as the Highway Authority will always carry out an inspection on these reinstatements and if they are deemed to be below standard we will instruction the company to come back out and resolve at their costs, not the taxpayer.

    Posted by Buckinghamshire Council at 11:42, Mon 4 December 2023

This report is now closed to updates. You can make a new report in the same location.