You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Junction plough lane to Wexham st

Reported via mobile in the Ditch issue category by Jeff stagg at 13:16, Thu 23 November 2023

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5245709.

1m square hole on edge of road 500 mm deep and full of water left by utility company, excavated about 2 months ago due to water bubbling up from underground , I’ve contacted Thames water but they have no record of it unless maybe they used contractors.Also barriers constantly falling into road

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • We know that an important part of any road network is the drainage system which is designed to carry water away from the road surface. As a general rule ditches along the side of the road are the responsibility of whoever owns the land on which they are situated, they should maintain and keep the ditch capable of carrying water away from the road.

    The Local Area Technician will carry out an inspection within 10 days and if it is the responsibility of Buckinghamshire Council and a repair is required, we will carry out the work. If the responsibility is with the landowner, we will write to them and request they carry out the necessary work.

    Posted by Buckinghamshire Council at 13:16, Thu 23 November 2023

  • Update

    We are very pleased to tell you that the issue reported has now been resolved.

    Alongside our Highways Safety Inspections, reports from the public help us to keep the roads in Buckinghamshire safe.

    State changed to: Fixed

    Posted by Buckinghamshire Council at 10:30, Tuesday 13 February 2024

This report is now closed to updates from the public. You can make a new report in the same location.