You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

The bridge from new greenway path between Berryfields and Buckingham park, just past the 2nd gate from Skatepark end

Reported via desktop in the Bridges category anonymously at 09:57, Saturday 18 November 2023

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5226283.

This was reported on 24/10 incident number 5130910. I attached 2 photos, one of this bridge, which my dog fell off, and which several people have commented on locally as being so slippery in wet conditions that it is unsafe, and one of another bridge further round but into the same field, which has an extra side rail and gripper strips underfoot, which is far easier to use. The photo shown on the original fix my street was of the safe bridge, not the one I wished to report…

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This has been passed to the Structures Team to investigate the enquiry/issue regarding a bridge issue.

    They will carry out an inspection within the next 10 working days and if required arrange to resolve the issue.

    Posted by Buckinghamshire Council at 09:57, Saturday 18 November 2023

This report is now closed to updates. You can make a new report in the same location.