Fixed
Please see photos
Reported via desktop in the Bollards or railings category anonymously at 13:49, Saturday 11 November 2023
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5199916.
Bollard has been knocked down and needs repairing.
Updates
-
This has been passed to your local area technician to investigate the enquiry/issue.
They will carry out an inspection and order a repair if required, this can take up to 20 working days. If however, a replacement bollard/railing is required, we will need to order this as we do not hold them in stock and this can take up to 6-8 weeks.
Posted by Buckinghamshire Council at 13:49, Saturday 11 November 2023
-
Update
The issue reported has been assessed and classified as an emergency, which means it will be repaired or made safe in line with our Highway Safety Inspection Policy.Unfortunately, it is not always possible to carry out a permanent repair immediately, in these cases we will always ensure the area/defect is made safe and continue to monitor it in line our Highways Safety Inspection Policy. A permanent repair will be made when resource is available, thank you for bringing this to our attention.
State changed to: Closed
Posted by Buckinghamshire Council at 12:12, Monday 20 November 2023
-
Update
We are very pleased to tell you that the issue reported has now been resolved.
Alongside our safety inspection policy, reports from the public help us to keep the roads in Buckinghamshire safe.
State changed to: Fixed
Posted by Buckinghamshire Council at 15:13, Monday 20 November 2023
This report is now closed to updates. You can make a new report in the same location.