You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Fairford leys and fowler road junction

Reported via mobile in the Bollards or railings category anonymously at 14:42, Wed 1 November 2023

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5162408.

The Bollard was down at stipulated at the correct time. As my I went over the bollard it rised up damaged the underneath of the vehicle. I have attached pictures of my vehicle. I had a passenger with me .

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This has been passed to your local area technician to investigate the enquiry/issue.

    They will carry out an inspection and order a repair if required, this can take up to 20 working days. If however, a replacement bollard/railing is required, we will need to order this as we do not hold them in stock and this can take up to 6-8 weeks.

    Posted by Buckinghamshire Council at 14:42, Wed 1 November 2023

This report is now closed to updates. You can make a new report in the same location.