You can move around with your keyboard
plus
minus
left
right
Drop pin on the map to start a new report
space
Press space again to adjust the location
space
Start new report here Reposition report here
Back to all reports

Old Rectory Lane

Reported via desktop in the Road surface category anonymously at 10:52, Friday 22 September 2023

Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5020702.

For the last few days, there have been lorries with a massive load coming down this lane. The cabins on the back overhang. They are impossible to get around so all the residents are having to reverse back up with windy narrow road dangerously. I believe the lorries are delivering to Martin Bakers or perhaps something else, but they do not have to take this tiny road. It is making residents and carers late for appointments, and causing chaos. I'm shocked there are no escort vehicles for the lorries, as they are just so big for this tiny lane. Please can this be looked into. Thank you.

RSS feed of updates to this problem Receive email when updates are left on this problem.

Updates

  • This has been passed to the local area technician to investigate the enquiry/issue regarding a pothole/road surface.

    During winter months we receive a very high number of reports regarding potholes or a poor road surface, it's easy to assume that potholes are formed due to roads being poorly maintained but that is not usually the case. There are many factors that can cause potholes, particularly during the winter months when water seeps in through cracks in the road surface, collecting underneath and when the water freezes, it expands and creates cracks in the road surface.

    Our priority is always the safety of road users, so in some cases during busy periods a permanent repair is not always possible immediately. However, temporary repairs are a way to ensure the area is safe until such times as we can return to make a permanent repair.

    Posted by Buckinghamshire Council at 10:52, Friday 22 September 2023

  • Update

    An initial assessment has been made and further work to investigate this enquiry is required. This should be completed within the next 28 days.

    Please be assured we will continue to monitor the issue in line with our Highways Safety Inspection Policy.

    Posted by Buckinghamshire Council at 13:51, Sunday 24 September 2023

This report is now closed to updates. You can make a new report in the same location.