Fixed
Go past the hampden arms PH (on left). Turn left down Hampden rd before it becomes Pink rd. the edging that has degraded is appox 30m down the hill on the right hand side.
Reported via mobile in the Pothole category anonymously at 18:47, Tue 19 September 2023
Sent to Buckinghamshire Council less than a minute later. FixMyStreet ref: 5011230.
The rd has deteriorated and isn’t wide enough for 2 vehicles to pass safely. There are white lines down the centre of the rd. A car passed me and my tyre went into the gulley and burst. The edging need to be filled in or the white lines removed.
Updates
-
This has been passed to the local area technician to investigate the enquiry/issue regarding a pothole/road surface.
During winter months we receive a very high number of reports regarding potholes or a poor road surface, it's easy to assume that potholes are formed due to roads being poorly maintained but that is not usually the case. There are many factors that can cause potholes, particularly during the winter months when water seeps in through cracks in the road surface, collecting underneath and when the water freezes, it expands and creates cracks in the road surface.
Our priority is always the safety of road users, so in some cases during busy periods a permanent repair is not always possible immediately. However, temporary repairs are a way to ensure the area is safe until such times as we can return to make a permanent repair.
Posted by Buckinghamshire Council at 18:47, Tue 19 September 2023
-
Update
We have completed our inspection of the issue and have made arrangements for it to be resolved within five working days.
State changed to: Action scheduled
Posted by Buckinghamshire Council at 13:54, Thu 21 September 2023
-
Update
We are very pleased to tell you that the issue reported has now been resolved.
Alongside our safety inspection policy, reports from the public help us to keep the roads in Buckinghamshire safe.
State changed to: Fixed
Posted by Buckinghamshire Council at 15:02, Wed 27 September 2023
-
Update
We have completed our inspection of the issue and have made arrangements for it to be resolved within five working days.
State changed to: Action scheduled
Posted by Buckinghamshire Council at 12:49, Tuesday 16 January 2024
-
Update
We are very pleased to tell you that the issue reported has now been resolved.
Alongside our Highways Safety Inspections, reports from the public help us to keep the roads in Buckinghamshire safe.
State changed to: Fixed
Posted by Buckinghamshire Council at 14:43, Friday 2 February 2024
This report is now closed to updates from the public. You can make a new report in the same location.